First-day-on-site checklist covering welfare, safety, signage, and fire requirements. Generates a sign-off record.
The first day on site sets the tone for the project. Suitable welfare must be available from the start, and the construction phase plan, fire and emergency arrangements, site rules and controls must be specific to the work and people affected. This checklist records a limited set of prompts; it cannot determine that every applicable duty has been met, replace inspections or prove site readiness.
Part of Builder Tools Utilities — construction tools for UK tradespeople.